RV News

RVGuide News Blog

The RVGuide News Blog is your source for latest news and stories from the world of recreational vehicles. Check back regularly as the RVGuide Blog is updated with the latest information, photos and video from manufacturers, trade shows and the RV community.

By: On: Tuesday March 16 2010

solar0316Solar Power, Inc. has been awarded a contract by Temescal Canyon RV, LLC to design and build an elevated Recreational Vehicle (RV) parking structure. The parking structure will incorporate a 1.75 megawatt DC solar system utilizing SPI’s top-ranked solar modules.

In addition to power generation, the system structure will also be used to provide RVs with covered parking and protection from the environment at the Temescal Canyon RV storage. Once completed, the owner-financed system will be the largest of its kind in the world. The facility is located in Riverside County adjacent to the City of Corona, Calif. The project is scheduled to begin in late March of this year and be completed by July.

The Temescal Canyon RV storage facility will consist of 400 stalls of which 280 will offer covered RV parking provided by the elevated solar system SPI is developing. This is the second project SPI has performed for the property management group that is developing the facility. In 2008, SPI developed a 160 kW system for the Temescal Canyon Storage Center, LLC. The storage center is adjacent to the site for the Temescal Canyon RV, LLC.




Recent Blog Posts

Recent Comments

  • william
    I have a 97 sunnybrook 26fk need a finder skirt ca you help me?
  • Wilbur
    trying to find a fender skirt for a 24FB, year 1998 travel trailer
  • Sam
    Anybody have experience with Lifestyle RV? Not really familiar with the brand, but this looks...
  • Martin B.
    I really like how the bunks don’t mess with the rest of the trailer. This is a...